Raisbeck Aviation High School

Replace Fire Supression & FA  Bldg 1422

This was a complete historic renovation of a 200,000+ square foot high school for Tacoma School District. Unique elements of work include refurbishment of existing historic light fixtures and new stadium lighting for the Lincoln Bowl. New construction was closely coordinated with the general contractor to preserve the historic look and nature of the facility.

Lincoln High School

Totem excelled by providing state of the art construction services for a new high school in Highline School District. Elements of this project include advanced lighting control systems, telecommunications, fire alarm / mass notification, audio visual, DAS, security and CCTV system. Our team of installers met the difficulties of modern construction head on and completed this project with the utmost in qualify and craftsmanship.

This project is a retro-fit of an existing 250,000 sq ft cargo handling facility at McChord Field, JBLM. We installed an advanced technology fire alarm and mass notification system in a facility which operates 24/7. Careful attention was necessary to maintain the existing life safety systems throughout construction, which were removed upon completion of the new systems. This project also included 15kV primary distribution and a new electrical service for the fire pump control room.

               Commercial Projects

Totem provided the electrical construction services for a new air traffic control tower. Totem installed specialty systems such as lightning protection, redundant emergency back-up systems, communications cabling and 15kV cabling. Totem performed pre-construction services include a complete BIM model of the electrical systems, which allowed for a well-coordinated and streamlined installation process. - Gray Army Airfield, JBLM WA

Air Traffic Control Tower